Factronics USA
FSMA 204 traceability rule enforcement: January 2026. Don't be the example.
Service - Equipment Readiness Assessment

Find Out What Equipment Your Auditor Expects to See Before They Walk In.

Most Form 483 observations in small to mid manufacturers come from equipment gaps. Missing coders. Outdated inspection systems. Incomplete paperwork. We walk your line, find what you need, and give you a written report.

  • Structured equipment walkthrough , We check every coding, marking, and inspection point on your line
  • Written gap report (PDF) , Equipment gaps ranked critical, high, and medium with cost estimates
  • Equipment roadmap , 30/60/90-day plan for what to install, upgrade, or fix
Request My Equipment Assessment

No commitment. We come to your facility.

Pharmaceutical manufacturing line, equipment and serialization readiness
1 day
On-site audit
5 days
Written report
30/60/90
Remediation plan
What Is Coming

Your Equipment Is What Auditors Look At First

FSMA 204 Starts Jan 2026

The food traceability rule requires lot-level records and 24-hour traceability for high-risk foods. Most small manufacturers we assess are not ready.

DSCSA Is Already Active

Serialization at the unit level is not "coming." Distributors are already rejecting non-compliant product. No more grace period.

Form 483 = Public Record

FDA observation letters become public and appear in your customer's supplier audits. One 483 can cost a major contract.

What We Inspect

The Hardware, Records, and Workflows Auditors Check

A real audit checks equipment performance, documentation, and operator habits. So do we.

Anritsu XR75 X-ray inspection system
X-ray inspection - sensitivity records and validation
Anritsu metal detector
Metal detector - daily verification logs
Laser coding on jam jar lids
Lot and expiry coding - placement and legibility
Laser coded plastic caps
DSCSA serialization - unit-level identifier checks
Inkjet coding on glass bottles
Print-quality records and operator verification
Anritsu XR series X-ray tower
Equipment IQ/OQ/PQ documentation review
Before vs After

What Actually Changes on Your Floor

Without Factronics

Today: you don't know what you don't know

  • No equipment review before the inspector arrives
  • Equipment validation files missing or incomplete
  • FSMA 204 traceability not mapped from end to end
  • DSCSA serialization gaps not addressed
  • Operator records don't match procedures
  • Surprise findings cost weeks of rushed fixes
With Factronics

After the assessment: a written gap list and a calm fix plan

  • Findings documented before the auditor sees them
  • Equipment gaps mapped with effort estimates
  • Traceability flow diagrammed from end to end
  • DSCSA serialization plan with equipment specs
  • Operator records aligned to procedures with templates
  • 30/60/90-day plan you can follow without panic
Equipment Readiness Assessment

Everything Covered in an Equipment Walkthrough

Designed to find every coding, inspection, marking, and labeling gap on your line.

  • Equipment inventory review
    We list every coding, marking, inspection, and labeling machine on your line
  • On-site equipment walkthrough (1 day)
    Field engineer walks every line station and checks equipment against regulations
  • Equipment capability gap analysis
    What each machine can and cannot do. Mapped to FSMA 204, DSCSA, and GMP requirements.
  • Traceability equipment mapping
    Which coders, readers, and inspection systems handle each traceability data point
  • Written gap report with severity ranking
    PDF with critical, high, and medium equipment gaps. Photos and cost estimates included.
  • 30/60/90-day equipment roadmap
    Prioritized plan for what to install, upgrade, or replace. Yours to use with any vendor.
How an Assessment Runs

From Walkthrough to Report in 14 Days

01

Pre-visit equipment review (Days 1-4)

Tell us what equipment you have. We map the gaps against regulations before we arrive.

02

On-site equipment walkthrough (Days 5-7)

We arrive with a checklist. Walk every station. Photograph every machine. Document every gap.

03

Written report and equipment roadmap (Day 14)

PDF report with severity-ranked gaps and a 30/60/90-day plan for what to install, upgrade, or replace.

Our Promise

Equipment Performance Standard

If the equipment we recommend and install does not meet the specs in our scope of work within the first 90 days, we will fix or replace it at no charge.Your compliance program is run by your team. We provide the equipment and documentation.
Recent Results

What Changed on the Floor

Snack / Bakery

Superior Snacks

Two lines, one validated coding standard, and 90% lower consumable costs.

TT500 Thermal Transfer Overprinter (flowpack line)
Meat & Proteins

NSP Quality Meats

Cold-chain thermoformer deployed on a deadline that seemed impossible.

Variovac Thermoformer / Vacuum Packaging System
Snack / Chips

Craize Corn Inc.

Scaling a fragile snack format without sacrificing product integrity.

JMK Vertical VFFS (Empacadora Vertical)
Common Questions

Things We Hear All the Time

No. We are not an FDA-certified third-party auditor. We do equipment readiness walkthroughs to find gaps in your coding, inspection, and labeling equipment. Your team uses the report to close gaps before the regulator arrives.
Equipment Readiness Assessment - Confidential

Find Your Equipment Gaps Before the Auditor Does

Tell us about your facility, your equipment, and any upcoming audit dates. We will send a custom assessment proposal within 48 hours.

No commitment. We come to your facility.